SAQA All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.
SOUTH AFRICAN QUALIFICATIONS AUTHORITY 
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: 

Install and commission photovoltaic supplied pump 
SAQA US ID UNIT STANDARD TITLE
113871  Install and commission photovoltaic supplied pump 
ORIGINATOR
SGB Electrical Engineering & Construction 
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY
-  
FIELD SUBFIELD
Field 12 - Physical Planning and Construction Electrical Infrastructure Construction 
ABET BAND UNIT STANDARD TYPE PRE-2009 NQF LEVEL NQF LEVEL CREDITS
Undefined  Regular  Level 2  NQF Level 02 
REGISTRATION STATUS REGISTRATION START DATE REGISTRATION END DATE SAQA DECISION NUMBER
Passed the End Date -
Status was "Reregistered" 
2007-04-03  2009-02-18  SAQA 0160/05 
LAST DATE FOR ENROLMENT LAST DATE FOR ACHIEVEMENT
2010-02-18   2013-02-18  

In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise.  

This unit standard is replaced by: 
US ID Unit Standard Title Pre-2009 NQF Level NQF Level Credits Replacement Status
258927  Install and commission photovoltaic supplied water pump  Level 2  NQF Level 02   

PURPOSE OF THE UNIT STANDARD 
This unit standard is for persons in the Electrical Engineering; Generation; Distribution; Transmission, Construction and Renewable Energy Sector.

A person credited with this unit standard will be capable of:
  • Install and commission photovoltaic supplied water pump.

    This unit standard will contribute to the full development of the learner within the electrical engineering and construction environment by providing recognition, further mobility and transportability within the field of Physical Planning and Construction. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the electrical infrastructure and construction environment. 

  • LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING 
    The following knowledge, skills attitude and / or equivalent:
  • An understanding of how the components in a photovoltaic supplied system functions
  • An understanding of how DC motors operate
  • An understanding of how single phase AC motors operate
  • Unit standard on the Installation of a photovoltaic supplied system
  • Statutory requirements
  • Use of relevant testing and measuring equipment and hand tools 

  • UNIT STANDARD RANGE 
  • A photovoltaic supplied pump includes but is not limited to:
    DC pump
    AC inverter supplied pump
  • Testing and measuring equipment include but is not limited to:
    Multimeters,
    Insulation tester,
    Clip-on ammeter
  • Statutory Requirements include but are not limited to:
    OHS Act,
    SABS Regulations,
    NRS Code of Practise
    Local Authority requirements,
    Manufacturer`s specifications
  • Work site procedures.
  • Electronic devices may include but are not limited to - Voltage regulators, inverters, compensators etc. 

  • Specific Outcomes and Assessment Criteria: 

    SPECIFIC OUTCOME 1 
    Plan to install and commission water pump. 
    OUTCOME RANGE 
    DC pump, single-phase inverter supplied pump. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. The tasks are interpreted and a sequence of operation is determined according to the job instruction. 

    ASSESSMENT CRITERION 2 
    2. Applicable electrical drawings are correctly interpreted and selected to meet job requirements. 

    ASSESSMENT CRITERION 3 
    3. Equipment and personal protective equipment is selected, inspected and checked for functionality and safety prior to commencement. 

    ASSESSMENT CRITERION 4 
    4. Safety- and work site procedures are obtained as per job requirements. 

    ASSESSMENT CRITERION 5 
    5. The water pump, its associated electronic control devices, photovoltaic array and mounting bracket are identified and selected according to job instructions. 

    ASSESSMENT CRITERION 6 
    6. Permission is obtained to carry out task according to instructions and drawings. 

    ASSESSMENT CRITERION 7 
    7. Appropriate tools are identified and selected to meet the requirements of the task. 

    SPECIFIC OUTCOME 2 
    Prepare to install, connect and commission a photovoltaic supplied water pump. 
    OUTCOME RANGE 
    DC pump, single-phase inverter supplied pump. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. The work area is demarcated according to work site procedures. 

    ASSESSMENT CRITERION 2 
    2. The water pump, its associated electronic control devices, photovoltaic array and mounting bracket are checked in accordance with manufacturer`s specifications and functional requirements. 

    ASSESSMENT CRITERION 3 
    3. Work site is inspected for safety and hazards and corrective action is taken according to statutory requirements. 

    ASSESSMENT CRITERION 4 
    4. Installation area is prepared for the placing, mounting and securing of the pump, photovoltaic array and mounting bracket as per job instructions, drawings and diagrams. 

    SPECIFIC OUTCOME 3 
    Install a photovoltaic supplied water pump. 
    OUTCOME RANGE 
    DC pump, single-phase inverter supplied pump. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Appropriate tools are selected and used correctly as per manufacturer`s specifications and work site standards. 

    ASSESSMENT CRITERION 2 
    2. All machines and associated control gear is tested for functionality to meet desired operational requirements. 

    ASSESSMENT CRITERION 3 
    3. The water pump, its associated electronic control devices, photovoltaic array and mounting bracket are installed according to instructions, drawings, diagrams, manufacturer`s specifications. 

    ASSESSMENT CRITERION 4 
    4. Explain the consequences of not using the tools according to statutory requirements. 

    SPECIFIC OUTCOME 4 
    Connect a photovoltaic supplied water pump. 
    OUTCOME RANGE 
    DC pump, single-phase inverter supplied pump. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Appropriate tools are used to meet the requirements of the task according to statutory requirements. 

    ASSESSMENT CRITERION 2 
    2. All personal protective equipment is used as per safety requirements and work site requirements. 

    ASSESSMENT CRITERION 3 
    3. The appropriate control gear is connected to the AC machines as per manufacturer`s specifications and operational requirements. 

    ASSESSMENT CRITERION 4 
    4. The AC machines and associated control gear are connected to supply and load according to manufacturers specifications and operational requirements. 

    SPECIFIC OUTCOME 5 
    Commission a photovoltaic supplied water pump. 
    OUTCOME RANGE 
    DC pump, single-phase inverter supplied pump. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Appropriate test and measuring equipment are selected to meet the job requirements. 

    ASSESSMENT CRITERION 2 
    2. Measuring and testing equipment are used correctly and safely. 

    ASSESSMENT CRITERION 3 
    3. Tests are carried out according to work site procedures and statutory requirements. 

    ASSESSMENT CRITERION 4 
    4. Faults are traced and rectified where applicable according to faultfinding procedures. 

    ASSESSMENT CRITERION 5 
    5. Commissioning is carried out and operational tests conducted to determine if the AC machine and control gear is functioning according to installation-and manufacturer`s requirements. 

    SPECIFIC OUTCOME 6 
    Complete installation, connection and commissioning of a photovoltaic supplied water pump. 
    OUTCOME RANGE 
    DC pump, single-phase inverter supplied pump. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. The work area is restored to a serviceable condition according to housekeeping and environmental requirements. 

    ASSESSMENT CRITERION 2 
    2. Appropriate tools are cared for and stored according to statutory requirements. 

    ASSESSMENT CRITERION 3 
    3. Damaged or faulty tools are identified, marked for repair or replacement or reported according to statutory requirements. 

    ASSESSMENT CRITERION 4 
    4. Tests are recorded and reported as per data management systems and reporting procedures. 


    UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS 
    1. Anyone assessing a learner against this unit standard must be registered as an assessor with the relevant ETQA.

    2. Any provider offering learning that will enable achievement of this unit standard must be accredited as a provider through the relevant ETQA.

    3. Moderation of assessment will be overseen by the relevant ETQA according to the moderation guidelines in the relevant qualification and the agreed ETQA procedures. 

    UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE 
  • Basic safety procedures related to testing and measuring equipment and hand tools.
  • Work site procedures
  • Installation, connection, commissioning, testing and measuring techniques.
  • Names, locations and functions of appropriate tools.
  • Care, storage and safety related to each tool. 

  • UNIT STANDARD DEVELOPMENTAL OUTCOME 
    N/A 

    UNIT STANDARD LINKAGES 
    N/A 


    Critical Cross-field Outcomes (CCFO): 

    UNIT STANDARD CCFO IDENTIFYING 
    Identify and solve problems in installing, connecting testing and commissioning a photovoltaic supplied water pump. 

    UNIT STANDARD CCFO WORKING 
    Work effectively with others involved during installation, connecting and commissioning a photovoltaic supplied water pump. 

    UNIT STANDARD CCFO ORGANISING 
    Organise and manage one self in planning the work and sequence of tasks. 

    UNIT STANDARD CCFO COLLECTING 
    Collect, analyse, organise and critically evaluate information obtained during installation, connecting and commissioning a photovoltaic supplied water pump. 

    UNIT STANDARD CCFO COMMUNICATING 
    Communicate with all involved, the interpretation and reporting processes. 

    UNIT STANDARD ASSESSOR CRITERIA 
    N/A 

    UNIT STANDARD NOTES 
    This unit standard has been replaced by unit standard 258927, which is "Install and commission photovoltaic supplied water pump", Level 2, 3 credits.

    Supplementary Information:

    Specified Requirements
  • SABS
  • OHS Act
  • NRS 

  • QUALIFICATIONS UTILISING THIS UNIT STANDARD: 
      ID QUALIFICATION TITLE PRE-2009 NQF LEVEL NQF LEVEL STATUS END DATE PRIMARY OR DELEGATED QA FUNCTIONARY
    Elective  20419   National Certificate: Electrical Engineering  Level 3  NQF Level 03  Passed the End Date -
    Status was "Registered" 
    2004-02-10  Was EWSETA until Last Date for Achievement 
    Elective  48475   National Certificate: Electrical Engineering  Level 3  NQF Level 03  Passed the End Date -
    Status was "Reregistered" 
    2009-02-18  Was EWSETA until Last Date for Achievement 


    PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: 
    This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here.
     
    NONE 



    All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.