All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Inspect and test lift pit equipment |
SAQA US ID | UNIT STANDARD TITLE | |||
119270 | Inspect and test lift pit equipment | |||
ORIGINATOR | ||||
SGB Engineering | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Engineering and Related Design | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 5 | Level TBA: Pre-2009 was L5 | 3 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard will be useful to people who are required to inspect and test lift equipment to ensure safety to users and maintenance personnel in accordance with the Occupational Health and Safety Act.
People credited with this unit standard are able to |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The credit calculation is based on the assumption that learners are already competent in terms of the following outcomes or areas of learning when starting to learn towards this unit standard:
|
UNIT STANDARD RANGE |
The following scope and context applies to the whole unit standard:
Specific range statements are provided in the body of the unit standard where they apply to particular specific outcomes or assessment criteria. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan work activities. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Work instructions are interpreted and a sequence of operation is determined according to worksite procedures, company standards and SANS safety requirements. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 2 |
The purpose of testing and inspecting equipment is explained in terms of SANS safety requirements and company standards. |
ASSESSMENT CRITERION 3 |
Tools, testing equipment and materials selected are ensured to be appropriate for the requirements of the work activity. Reasons why specific tools and testing equipment are selected are explained in terms of accuracy of work and required results. |
ASSESSMENT CRITERION RANGE |
Test equipment includes relevant hand tools |
ASSESSMENT CRITERION 4 |
Work schedules are communicated with team members according to worksite procedures. The consequences of poor communication are explained in terms of flow of information, work stoppages and potential hazards to workers. |
ASSESSMENT CRITERION 5 |
Personal protective equipment (PPE) is selected, ensured to be appropriate and checked according to statutory requirements. The consequences of not using personal protective equipment are explained in terms of personal risk and liability. |
ASSESSMENT CRITERION RANGE |
Statutory requirements include but are not limited to: OHS Act, Mine Health and Safety Act (where applicable) relevant SANS specifications and local authority requirements |
SPECIFIC OUTCOME 2 |
Prepare work area. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Authorisation to access the worksite is obtained according to worksite procedures, SANS safety requirements and company procedures. The consequences of not obtaining authorisation are explained in terms of work interruptions and liability. |
ASSESSMENT CRITERION RANGE |
Worksite procedures include but are not limited to: written or verbal procedures, formal and informal methods |
ASSESSMENT CRITERION 2 |
Work area is prepared for inspection and testing according to statutory requirements and worksite procedures. Potential hazards are identified and rectified in accordance with safety legislation. |
ASSESSMENT CRITERION RANGE |
Statutory requirements include but are not limited to: OHS Act, Mine Health and Safety Act (where applicable) relevant SANS specifications and local authority requirements |
ASSESSMENT CRITERION 3 |
Defects and potentially hazardous conditions are identified and corrective actions taken according to worksite procedures. |
ASSESSMENT CRITERION RANGE |
Corrective actions include repairing and/or reporting |
ASSESSMENT CRITERION 4 |
Public access to the worksite is restricted in accordance with statutory requirements and worksite procedures. Consequences of not restricting public access are explained in terms of work flow and liability. |
ASSESSMENT CRITERION 5 |
Personal protective equipment is used in accordance with statutory requirements. |
SPECIFIC OUTCOME 3 |
Inspect and test lift pit equipment. |
OUTCOME RANGE |
Inspection and testing of pit equipment includes: mechanical fixtures, access doors, buffers, sheaves, protective barriers and compensation equipment |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The equipment is inspected and tested for compliance with manufacturer's standards, statutory and SANS safety requirements. |
ASSESSMENT CRITERION RANGE |
Inspections include SANS safety requirements pertaining to the installation and maintenance of lifts |
ASSESSMENT CRITERION 2 |
The purpose of inspecting and testing the equipment is explained in terms of legal and safety requirements. |
ASSESSMENT CRITERION 3 |
All fixed and moving components are inspected and tested using the appropriate measuring and testing devices. Reasons why specific measuring and testing devices are used are explained in terms of accuracy of work and required results. |
ASSESSMENT CRITERION 4 |
Deviances from acceptable standards are identified and reported according to statutory requirements and manufacturer's specifications. |
ASSESSMENT CRITERION 5 |
The operation of all safety devices are checked and tested according to statutory requirements. The consequences of not checking and testing all safety devices are explained in terms of potential risks and liability. |
ASSESSMENT CRITERION 6 |
Potential hazards associated with inspecting and testing of equipment are explained in terms of personal injury and damage to property. |
SPECIFIC OUTCOME 4 |
Complete work activities. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The worksite is cleared, secured and restored to a safe and serviceable condition in accordance with statutory requirements and worksite requirements. |
ASSESSMENT CRITERION 2 |
The importance of returning the worksite to a safe and serviceable condition is explained in terms of workflow and minimising hazards. |
ASSESSMENT CRITERION 3 |
Equipment and tools are checked, cleaned and stored according to company procedures. |
ASSESSMENT CRITERION 4 |
Work is completed and reported to appropriate personnel in accordance with company procedures. The importance of accurately completing documentation is explained in terms of legal responsibility. |
ASSESSMENT CRITERION RANGE |
Documentation reports include: SANS safety test documentation (annexure 'A', 'B' and 'C') and quality assurance documentation |
ASSESSMENT CRITERION 5 |
Work activities are completed within agreed timeframes. The importance of completing work within agreed timeframes is explained in terms of customer service and work interruptions. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
1. Anyone assessing a learner against this unit standard must be registered as an assessor with the relevant ETQA.
2. Any institution offering learning that will enable achievement of this unit standard must be accredited as a provider through the relevant ETQA by SAQA. 3. Moderation of assessment will be overseen by the relevant ETQA according to the moderation guidelines and the agreed ETQA procedures. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Essential embedded knowledge will be assessed through assessment of the specific outcomes in terms of the stipulated assessment criteria. Candidates are unlikely to achieve all the specific outcomes, to the standards described in the assessment criteria, without knowledge of the listed embedded knowledge. This means that for the most part, the possession or lack of the knowledge can be directly inferred from the quality of the candidate's performance. Where direct assessment of knowledge is required, assessment criteria have been included in the body of the unit standard.
The following embedded knowledge is addressed in an integrated way in the unit standard: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems and make decisions using critical and creative thinking.
|
UNIT STANDARD CCFO WORKING |
Work effectively with others as members of a team, group, organisation or community.
|
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself and ones activities responsibly and effectively.
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information.
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively, using visual, mathematical and/or language skills in the modes of oral and/or written presentations.
|
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically showing responsibility towards the environment and health of others.
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems by recognising that problem-solving contexts do not exist in isolation.
|
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Terminology
Terminology used in this unit standard is commonly used within the lift fraternity Notes to assessors Assessors should keep the following principles in mind when designing and conducting assessments against this unit standard: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 49511 | National Certificate: Lift Inspection | Level 5 | Level TBA: Pre-2009 was L5 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
Elective | 58275 | Further Education and Training Certificate: Lift Installation and Maintenance | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |