All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Operate and control the filling and closing of glass or rigid plastic containers for food products |
SAQA US ID | UNIT STANDARD TITLE | |||
120233 | Operate and control the filling and closing of glass or rigid plastic containers for food products | |||
ORIGINATOR | ||||
SGB Food | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 10 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2009-07-07 | 2009-12-02 | SAQA 0160/05 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2010-12-02 | 2013-12-02 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard replaces: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
9133 | Operate and control the filling and closing of glass or rigid plastic containers for food or beverage products | Level 2 | NQF Level 02 | 10 |
This unit standard is replaced by: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
336865 | Operate and control the filling and closing of glass or rigid plastic containers for food products | Level 3 | NQF Level 03 | 10 |
PURPOSE OF THE UNIT STANDARD |
This unit standard is intended for a person who has to fill and close glass or rigid plastic containers.
A person credited with this unit standard is able to: This unit standard will contribute to the full development of the learner within the food manufacturing and packaging environment by providing recognition, further mobility and transportability within the field of manufacturing and assembly. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the food manufacturing and packaging environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
Description of required skills:
|
UNIT STANDARD RANGE |
In the context of this unit standard, filling and closing of glass or rigid plastic containers can include any glass and rigid plastic bottles and jars that are closed by means of a screw top or any other type of sealable closing device. Plastic tubs with lids are included, but plastic sachets and carton containers are excluded.
This unit standard can also be used in the cosmetics, chemical, fast-moving-consumer-goods and pharmaceutical environment.This unit standard can also be applied in the case where rigid plastic containers are formed by the packaging machine prior to filling and closing. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Demonstrate an understanding of filling and closing of glass or rigid plastic containers. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The functions of packaging of products in glass or rigid plastic containers are explained according to standard packaging principles. |
ASSESSMENT CRITERION RANGE |
The explanation refers to:
|
ASSESSMENT CRITERION 2 |
The requirements for glass or rigid plastic containers are identified and explained according to standard food and packaging principles. |
ASSESSMENT CRITERION 3 |
The principles regarding filling and closing of glass or rigid plastic containers are described according to standard packaging principles. |
ASSESSMENT CRITERION 4 |
The operating principles of equipment for filling and closing of glass or rigid plastic containers are described according to standard packaging principles. |
ASSESSMENT CRITERION 5 |
Quality control tests for filling and closing of glass or rigid plastic containers are described according to standard food principles. |
ASSESSMENT CRITERION 6 |
The importance of quality control tests on glass or rigid plastic containers is described according to standard food principles. |
ASSESSMENT CRITERION 7 |
The components of the filling and closing equipment are identified and the purpose of each component is explained according to standard packaging principles. |
SPECIFIC OUTCOME 2 |
Prepare to fill and close glass or rigid plastic containers. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Personal preparation is done according to standard operating procedures. |
ASSESSMENT CRITERION RANGE |
Personal preparation includes:
|
ASSESSMENT CRITERION 2 |
The production schedule for packaging is obtained and interpreted within scope of work. |
ASSESSMENT CRITERION 3 |
The work area is prepared according to standard operating procedures. |
ASSESSMENT CRITERION 4 |
The packaging material and product are received and maintained according to standard operating procedures. |
ASSESSMENT CRITERION 5 |
Shortages in packaging material and product are reported according to standard operating procedures. |
ASSESSMENT CRITERION 6 |
The packaging equipment and material are prepared according to standard operating procedures. |
ASSESSMENT CRITERION 7 |
The packaging parameters are set according to standard operating procedures. |
ASSESSMENT CRITERION 8 |
The reasons for specific parameter settings are explained according to standard packaging principles. |
ASSESSMENT CRITERION 9 |
Problems during preparation are solved in line with standard operating procedures and within scope of work. |
ASSESSMENT CRITERION 10 |
A sample is taken of the product and sent for analysis according to standard operating procedures. |
ASSESSMENT CRITERION 11 |
A conclusion is drawn on the conformance of the product to specifications and hence its suitability to be packed. |
ASSESSMENT CRITERION 12 |
The product is released for packaging according to standard operating procedures. |
ASSESSMENT CRITERION 13 |
The packaging equipment is started up according to standard operating procedures. |
SPECIFIC OUTCOME 3 |
Fill and close glass or rigid plastic containers. |
OUTCOME RANGE |
Pack continuously for 30 minutes at an acceptable packaging rate, at the correct weight or volume and without product and packaging material wastage. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The filling and closing machine is operated and controlled according to standard operating procedures and safety requirements. |
ASSESSMENT CRITERION 2 |
Containers are filled and closed according to standard operating procedures and safety requirements. |
ASSESSMENT CRITERION 3 |
Filling and closing parameters are monitored and controlled according to standard operating procedures. |
ASSESSMENT CRITERION 4 |
Where filling and closing equipment is operated simultaneously with other production processes, the filling and closing process is synchronized according to standard operating procedures. |
ASSESSMENT CRITERION 5 |
Filled and closed containers meet site-specifications. |
ASSESSMENT CRITERION 6 |
Problems during packaging are solved in line with standard operating procedures and within scope of work. |
SPECIFIC OUTCOME 4 |
Perform end of filling and closing procedures. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The packaging equipment is shut down according to standard operating procedures. |
ASSESSMENT CRITERION 2 |
A changeover is performed according to standard operating procedures. |
ASSESSMENT CRITERION 3 |
First line maintenance is performed according to standard operating procedures and within scope of work. |
ASSESSMENT CRITERION RANGE |
First line maintenance includes:
|
ASSESSMENT CRITERION 4 |
Records of the packaging process are kept in accordance with standard operating procedures. |
ASSESSMENT CRITERION 5 |
Sub-standard filled and closed containers, and unused packaging materials and product are handled according to standard operating procedures. |
ASSESSMENT CRITERION 6 |
After packaging, the equipment and work area are left in accordance with standard operating procedures and requirements. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Embedded knowledge is reflected within the assessment criteria of each specific outcome. |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems in which response displays that responsible decisions, using critical and creative thinking, have been made by:
Refer to the following specific outcome: |
UNIT STANDARD CCFO WORKING |
Work effectively with others as a member of a team, group, organisation or community.
Refer to the following specific outcomes: |
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself and one's activities responsibly and effectively by:
Refer to the following specific outcome: |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information by:
Refer to the following specific outcomes: |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively by using mathematical and/or language skills in the modes of oral and/or written presentations by:
Refer to the following specific outcome: |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically, showing responsibility towards the environment and health of others.
Refer to the following specific outcomes: |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems by recognising that problem solving contexts do not exist in isolation.
Refer to the following specific outcomes: |
UNIT STANDARD CCFO CONTRIBUTING |
Contribute to the full personal development of each learner and the social and economic development of the society at large.
Refer to the following specific outcomes: |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
UNIT STANDARD NOTES |
This unit standard has been replaced by unit standard 336865, which is "Operate and control the filling and closing of glass or rigid plastic containers for food products", Level 3, 10 credits.
This unit standard replaces unit standard 9133 which is " Operate and control the filling and closing of glass or rigid plastic containers for food or beverage products ", Level 2, 10 credits. Supplementary Information: Legal requirements: The following acts and/or codes, current and future regulations and amendments will be applicable: Where applicable, the following International and National Standards should be considered: Definition of terms within this unit standard: Terminology: Clarification/ explanation/ definition. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 50024 | National Certificate: Dairy Primary Processing | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2009-12-02 | Was FOODBEV until Last Date for Achievement |
Elective | 50306 | Further Education and Training Certificate: Dairy Manufacturing Technology | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2018-07-26 | FOODBEV |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |