All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Prepare product for the next stage or for storage |
SAQA US ID | UNIT STANDARD TITLE | |||
12655 | Prepare product for the next stage or for storage | |||
ORIGINATOR | ||||
SGB Manufacturing and Assembly Processes | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 10 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Registered" |
2002-06-12 | 2005-04-13 | SAQA 0742/02 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2006-04-13 | 2009-04-13 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard is replaced by: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
119146 | Prepare manufactured plastics product for the next stage or for storage | Level 2 | NQF Level 02 | 10 |
PURPOSE OF THE UNIT STANDARD |
Carrying out post-production and finishing operations with manufactured product. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
This unit standard has been designed as the start of a progression. It is one of a series of unit standards for activities at and above this level. The credits assigned to it are based on the assumption that I am learning what is needed for this unit standard as part of my learning for a range of related unit standards at this level.
If I have experience in these related activities but do not have credits for them, I can obtain credits by being assessed through a process which recognises prior learning. If I do not have such experience of related activities, then my learning time will be increased. I can choose to be assessed and obtain credits against those other unit standards as I make progress towards the outcomes of this unit standard. |
UNIT STANDARD RANGE |
"Determine packing and finishing requirements" are activities like:
"Prepare working area" are activities like: "Finishing procedures" are operations like: "Post-production operations" are operations like: "Product and customer requirements" include things like: |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Determine packing and finishing requirements for product or components and prepare working area. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Components are ready for the next stage or for storage. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Operations and procedures to the finished or semi-finished product are carried out: 2. Products and equipment are handled and used safely and correctly 3. Wastage or damage to product is kept to a minimum 4. Reports are accurate and use correct terminology Understanding confirmed: 1. Respond to "why" and "how" questions relating to: |
SPECIFIC OUTCOME 2 |
Apply finishing procedures |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Components are ready for the next stage or for storage. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Operations and procedures to the finished or semi-finished product are carried out: 2. Products and equipment are handled and used safely and correctly 3. Wastage or damage to product is kept to a minimum 4. Reports are accurate and use correct terminology Understanding confirmed: 1. Respond to "why" and "how" questions relating to: |
SPECIFIC OUTCOME 3 |
Carry out post-production operations. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Components are ready for the next stage or for storage. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Operations and procedures to the finished or semi-finished product are carried out: 2. Products and equipment are handled and used safely and correctly 3. Wastage or damage to product is kept to a minimum 4. Reports are accurate and use correct terminology Understanding confirmed: 1. Respond to "why" and "how" questions relating to: |
SPECIFIC OUTCOME 4 |
Identify, respond to and report problems. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Components are ready for the next stage or for storage. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Operations and procedures to the finished or semi-finished product are carried out: 2. Products and equipment are handled and used safely and correctly 3. Wastage or damage to product is kept to a minimum 4. Reports are accurate and use correct terminology Understanding confirmed: 1. Respond to "why" and "how" questions relating to: |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Names & functions of:
Attributes, descriptions, characteristics & properties: Purpose of: Processes, events, causes and effects, implications: Procedures and techniques Regulations, legislation, agreements, policies, standards Theory: rules, principles, laws Relationships, systems: |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems.
|
UNIT STANDARD CCFO WORKING |
Work effectively with others. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage myself and my activities.
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information. |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically.
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems.
|
UNIT STANDARD NOTES |
This unit standard has been replaced by unit standard 119146, which is "Prepare manufactured plastics product for the next stage or for storage", level 2, credits 10. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 20888 | National Certificate: Plastics Manufacturing | Level 2 | NQF Level 02 | Passed the End Date - Status was "Registered" |
2005-06-12 | Was MERSETA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |