SAQA All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.
SOUTH AFRICAN QUALIFICATIONS AUTHORITY 
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: 

Organize and control concreting activities 
SAQA US ID UNIT STANDARD TITLE
15167  Organize and control concreting activities 
ORIGINATOR
SGB Civil Engineering Construction 
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY
-  
FIELD SUBFIELD
Field 12 - Physical Planning and Construction Civil Engineering Construction 
ABET BAND UNIT STANDARD TYPE PRE-2009 NQF LEVEL NQF LEVEL CREDITS
Undefined  Regular  Level 4  NQF Level 04  20 
REGISTRATION STATUS REGISTRATION START DATE REGISTRATION END DATE SAQA DECISION NUMBER
Passed the End Date -
Status was "Reregistered" 
2018-07-01  2023-06-30  SAQA 06120/18 
LAST DATE FOR ENROLMENT LAST DATE FOR ACHIEVEMENT
2024-06-30   2027-06-30  

In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise.  

This unit standard does not replace any other unit standard and is not replaced by any other unit standard. 

PURPOSE OF THE UNIT STANDARD 
Learners who are assessed as competent against this unit standard will be able to plan and program, the cost effective and safe erection of all Concreting related activities.

This competence forms part of the Elective learning and represents a specific context of supervision, i.e. the organising and controlling of concreting activities in a civil engineering construction context

It contributes to the development of a professional community of Civil Engineering Construction Supervisors. The contribution to The National Skills Development Strategy is the key developmental interface between learners and new competencies to be achieved.

Its contribution to socio-economic transformation is that learners would be able to undergo RPL-assessment and thereby receive recognition for previous learning and experience. The employability and career prospects of learners can therefore be enhanced by this qualification. 

LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING 
The following competencies: Read, interpret and use construction drawings and specifications; Establish and maintain the Health and Safety of a Work Site; Read and interpret drawings and specifications. 

UNIT STANDARD RANGE 
Identify and solve problems

Specific Outcome
Organize and control the erection of shuttering
Organize and control the installation of reinforcing
Organize and control the placement of concrete

Assessment Criteria:
  • Materials quantities are calculated from project specifications.
  • Materials are procured and stored.
  • Staff are identified for the process
  • Tools and equipment to be used for the process is identified and procured
  • Processes are supervised to ensure compliance with project specifications
  • Productivity is monitored throughout the process
  • Safety precautions are identified and implemented. 

  • Specific Outcomes and Assessment Criteria: 

    SPECIFIC OUTCOME 1 
    Demonstrate knowledge of technology. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. The technology of shuttering is explained. 
    ASSESSMENT CRITERION RANGE 
    Wood, metal shuttering, Temporary and permanent shuttering.At ground levels and elevated levels.
     

    ASSESSMENT CRITERION 2 
    2. The technology of placing reinforcing is explained. 
    ASSESSMENT CRITERION RANGE 
    At ground level and elevated heights. Different structural elements.
     

    ASSESSMENT CRITERION 3 
    3. The technologies of placing concrete under different situations are explained. 
    ASSESSMENT CRITERION RANGE 
    Floors, columns, slabs, beams.Elevated heights. Pumping concrete. Different admixtures. Transporting. Different curing methods.
     

    SPECIFIC OUTCOME 2 
    Organize and control the erection of shuttering. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Quantities of materials are calculated from project specifications. 

    ASSESSMENT CRITERION 2 
    2. Materials are procured and stored. 

    ASSESSMENT CRITERION 3 
    3. Staff are identified for the process of erecting shuttering. 

    ASSESSMENT CRITERION 4 
    4. Tools and equipment to be used in the process are identified and procured. 

    ASSESSMENT CRITERION 5 
    5. The erection of shuttering is supervised to ensure compliance with project specifications. 

    ASSESSMENT CRITERION 6 
    6. Productivity is monitored during the erection of shuttering. 

    ASSESSMENT CRITERION 7 
    7. Safety precautions are identified and implemented. 

    SPECIFIC OUTCOME 3 
    Organize and control the installation of reinforcing. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Quantities of materials are calculated from project specifications. 

    ASSESSMENT CRITERION 2 
    2. Materials are procured and stored. 

    ASSESSMENT CRITERION 3 
    3. Staff are identified for the process of reinforcing installation. 

    ASSESSMENT CRITERION 4 
    4. Tools and equipment to be used in the process are identified and procured Reinforcing installations are supervised to ensure compliance with project specifications. 

    ASSESSMENT CRITERION 5 
    5. Productivity is monitored during the installation of reinforcing. 

    ASSESSMENT CRITERION 6 
    6. Safety precautions are identified and implemented. 

    SPECIFIC OUTCOME 4 
    Organize and control the placement of concrete. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    1. Materials quantities are calculated from project specifications. 

    ASSESSMENT CRITERION 2 
    2. Materials are procured and stored. 

    ASSESSMENT CRITERION 3 
    3. Staff are identified for the process. 

    ASSESSMENT CRITERION 4 
    4. Tools and equipment to be used for the process is identified and procured. 

    ASSESSMENT CRITERION 5 
    5. Concrete placement is supervised to ensure compliance with project specifications. 

    ASSESSMENT CRITERION 6 
    6. Productivity is monitored during the placement of concrete. 

    ASSESSMENT CRITERION 7 
    7. Safety precautions are identified and implemented. 


    UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS 
  • Anyone assessing a learner or moderating the assessment of a learner against this unit standard must be registered as an assessor with the CETA - ETQA for "The National Certificate in the Supervision of Civil Engineering Construction Processes".
  • Any institution offering learning that will enable the achievement of this unit standard must be accredited as a provider with the CETA - ETQA
  • CETA - ETQA, or other ETQA`s who have a Memorandum of Understanding in place with CETA-ETQA, would be responsible for moderation of learner achievements of learners who meet the requirements of this qualification. 

  • UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE 
  • Programming techniques including: critical path, float time, linked activities, allocation of resources, earliest start and end dates, time scales, and activity sequencing.
  • Project specifications relative to shuttering, reinforcing and placement of concrete.
  • Productivity management
  • Occupational Health and Safety Management. 

  • UNIT STANDARD DEVELOPMENTAL OUTCOME 
    N/A 

    UNIT STANDARD LINKAGES 
    N/A 


    Critical Cross-field Outcomes (CCFO): 

    UNIT STANDARD CCFO IDENTIFYING 
    Identify and solve problems

    Specific Outcome
    Organize and control the erection of shuttering
    Organize and control the installation of reinforcing
    Organize and control the placement of concrete

    Assessment Criteria
  • Materials quantities are calculated from project specifications.
  • Materials are procured and stored.
  • Staff are identified for the process
  • Tools and equipment to be used for the process is identified and procured
  • Processes are supervised to ensure compliance with project specifications
  • Productivity is monitored throughout the process
  • Safety precautions are identified and implemented. 

  • UNIT STANDARD CCFO WORKING 
    Work effectively with others.

    Specific Outcome:
    Organize and control the erection of shuttering
    Organize and control the installation of reinforcing
    Organize and control the placement of concrete

    Assessment Criteria
  • Processes are supervised to ensure compliance with project specifications (quality control)
  • Productivity is monitored throughout the process
  • Safety precautions are identified and implemented. 

  • UNIT STANDARD CCFO ORGANISING 
    Employ self management.

    Specific Outcome:
    Organize and control the erection of shuttering.
    Organize and control the installation of reinforcing
    Organize and control the placement of concrete

    Assessment Criteria:
  • Processes are supervised to ensure compliance with project specifications (quality control). 

  • UNIT STANDARD CCFO COLLECTING 
    Manage information

    Specific Outcome:
    Organize and control the erection of shuttering
    Organize and control the installation of reinforcing
    Organize and control the placement of concrete

    Assessment Criteria:
  • Materials quantities are calculated from project specifications.
  • Materials are procured and stored.
  • Staff are identified for the process
  • Tools and equipment to be used for the process is identified and procured
  • Concrete placement is supervised to ensure compliance with project specifications
  • Productivity is monitored during the placement of concrete
  • Safety precautions are identified and implemented. 

  • UNIT STANDARD CCFO COMMUNICATING 
    Communicate effectively.

    Specific Outcome
    Organize and control the erection of shuttering
    Organize and control the installation of reinforcing
    Organize and control the placement of concrete

    Assessment Criteria
  • Quality requirements are communicated to staff
  • Productivity targets are communicated to staff
  • The necessary safety precautions to be applied during the process are communicated to staff. 

  • UNIT STANDARD CCFO SCIENCE 
    Demonstrate scientific and technological competence

    Specific Outcome:
    Organize and control the erection of shuttering
    Organize and control the installation of reinforcing
    Organize and control the placement of concrete

    Assessment Criteria
  • Materials quantities are calculated from project specifications.
  • Materials are procured and stored.
  • Staff are identified for the process
  • Tools and equipment to be used for the process is identified and procured
  • Processes are supervised to ensure compliance with project specifications
  • Productivity is monitored throughout the process
  • Safety precautions are identified and implemented. 

  • UNIT STANDARD CCFO DEMONSTRATING 
    Understand Contextual world-systems

    Specific Outcome
    Organize and control the erection of shuttering
    Organize and control the installation of reinforcing
    Organize and control the placement of concrete.

    Assessment Criteria
  • Processes are supervised to ensure compliance with project specifications
  • Productivity is monitored throughout the process
  • Safety precautions are identified and implemented. 

  • UNIT STANDARD ASSESSOR CRITERIA 
    N/A 

    REREGISTRATION HISTORY 
    As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. 

    UNIT STANDARD NOTES 
    N/A 

    QUALIFICATIONS UTILISING THIS UNIT STANDARD: 
      ID QUALIFICATION TITLE PRE-2009 NQF LEVEL NQF LEVEL STATUS END DATE PRIMARY OR DELEGATED QA FUNCTIONARY
    Elective  23682   National Certificate: Supervision of Civil Engineering Construction Processes: Labour Intensive Construction  Level 4  NQF Level 04  Passed the End Date -
    Status was "Registered" 
    2004-06-09  Was CETA until Last Date for Achievement 
    Elective  23674   National Certificate: Supervision of Civil Engineering Construction Processes: Road Works  Level 4  NQF Level 04  Passed the End Date -
    Status was "Registered" 
    2004-06-09  Was CETA until Last Date for Achievement 
    Elective  49053   National Certificate: Supervision of Construction Processes  Level 4  Level TBA: Pre-2009 was L4  Passed the End Date -
    Status was "Reregistered" 
    2018-06-30  Was CETA until Last Date for Achievement 


    PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: 
    This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here.
     
    NONE 



    All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.