All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Prepare borehole core for logging and sampling purposes from core containers |
SAQA US ID | UNIT STANDARD TITLE | |||
254535 | Prepare borehole core for logging and sampling purposes from core containers | |||
ORIGINATOR | ||||
SGB Mining and Minerals | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Fabrication and Extraction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 6 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2026-06-30 | 2029-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard replaces: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
11695 | Prepare borehole core for logging and sampling purposes from core containers | Level 3 | NQF Level 03 | 3 |
PURPOSE OF THE UNIT STANDARD |
This unit standard will be useful to people who are responsible to prepare borehole core for logging and sampling purposes from core containers.
People credited with this unit standard are able to: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The credit calculation is based on the assumption that learners are already competent in terms of the following outcomes or areas of learning when starting to learn towards this unit standard:
|
UNIT STANDARD RANGE |
N/A |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Demonstrate the knowledge required to prepare (handle and lay out) borehole core correctly in accordance with specified requirements. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The accepted principles for laying out borehole core are explained in terms of operational requirements. |
ASSESSMENT CRITERION 2 |
The contents and requirements of the work instruction and the consequences of non-compliance with the requirements are described in terms of the potential effect on the logging and sampling procedures. |
ASSESSMENT CRITERION 3 |
The importance of laying out the borehole core in accordance with the accepted geological principles and procedures is described to obtain accurate geological information. |
ASSESSMENT CRITERION 4 |
The principles are described to correctly measure true core losses and the correction for core gains in terms of specified requirements. |
ASSESSMENT CRITERION 5 |
The Occupational health and safety measures are described when working with chemicals during the washing and cleaning of contaminated core in accordance with the current legislation. |
SPECIFIC OUTCOME 2 |
Prepare to lay out the borehole core. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Permission to enter the workplace, when required, is obtained in accordance with laid down procedures. |
ASSESSMENT CRITERION 2 |
Personal protective equipment is selected and examined for any defects and used in accordance with legal and laid down procedures. |
ASSESSMENT CRITERION 3 |
Defective personal protective equipment is dealt with in accordance with laid down procedures. |
ASSESSMENT CRITERION 4 |
The tools, materials and equipment required for laying out the borehole core are selected, examined and verified in accordance with the work instruction received. |
ASSESSMENT CRITERION 5 |
Defective tools, materials and equipment are dealt with in accordance with laid down procedures. |
ASSESSMENT CRITERION 6 |
Potential and actual hazardous and sub-standard conditions found during the examination of the workplace are dealt with in accordance with laid down procedures. |
ASSESSMENT CRITERION RANGE |
Must include any one or a combination of the following:
|
ASSESSMENT CRITERION 7 |
The appropriate core trays are selected to accommodate the core size and cleaned, when necessary, in accordance with laid down procedure. |
ASSESSMENT CRITERION 8 |
The relevant core boxes/containers pertaining to the borehole are identified and placed in a sequential order by employing safe lifting procedures. |
ASSESSMENT CRITERION 9 |
The borehole details are determined, verified and recorded, all in accordance with the work instruction received. |
ASSESSMENT CRITERION RANGE |
SPECIFIC OUTCOME 3 |
Lay out borehole core. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Work related hazards and associated risks that have an effect on a safe and healthy work environment are dealt with in accordance with laid down procedures. |
ASSESSMENT CRITERION RANGE |
Must include any one or a combination of the following:
|
ASSESSMENT CRITERION 2 |
The borehole core is correctly laid out and fitted in accordance with accepted geological standards. |
ASSESSMENT CRITERION 3 |
The borehole core is washed, cleaned and dried, using the approved cleansing liquids and materials, when required and in a safe and healthy manner. |
ASSESSMENT CRITERION 4 |
Anomalous conditions are noted and deviations from the accepted lay out procedure are accurately recorded and reported. |
ASSESSMENT CRITERION RANGE |
Must include:
|
ASSESSMENT CRITERION 5 |
The tools, materials and equipment required for the layout procedure are correctly used in accordance with the work instruction. |
SPECIFIC OUTCOME 4 |
Conduct post-laying out activities and compile a report. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The tools, materials and equipment are cleaned and ensured to be ready for future use in accordance with the laid down procedure. |
ASSESSMENT CRITERION 2 |
The cleaning, labelling and storage of the used core boxes/containers are in accordance with the laid down procedure. |
ASSESSMENT CRITERION 3 |
The workplace is cleaned to comply with documented and recognised good housekeeping practices. |
ASSESSMENT CRITERION 4 |
The necessary report(s) are compiled in the required format and submitted to the relevant personnel and existing reports filed. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 5 |
The completion of the work is communicated to the relevant personnel in accordance with the laid down procedure. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
The following embedded knowledge is addressed in an integrated way in the unit standard:
|
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems and make decisions using critical and creative thinking.
Note: |
UNIT STANDARD CCFO WORKING |
Work effectively with others as members of a team, group, organisation or community.
Note: |
UNIT STANDARD CCFO ORGANISING |
Organise and manage themselves and their activities responsibly and effectively.
Note: |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information.
Note: |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively, using visual, mathematical and/or language skills in the modes of oral and/or written presentations.
Note: |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems by recognising that problem-solving contexts do not exist in isolation.
Note: |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
This unit standard replaces unit standard 11695, "Prepare borehole core for logging and sampling purposes from core containers", Level 3, 3 credits.
Terminology: Specified Requirements: Specified requirements include legal and site-specific requirements and are contained in one or more of the following documents: Legal: Site Specific: Containers can be any one or a combination of the following types: Tools, material and equipment can include the following: A Run: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 60349 | National Certificate: Mining Technical Support | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MQA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | CADDIS TRADING CC |
2. | MATHOME TRAINING AND DEVELOPMENT (PTY) LTD |
3. | PALABORA COPPER (PTY) LTD |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |