All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Fault find and repair Remote Control systems up to component level |
SAQA US ID | UNIT STANDARD TITLE | |||
258243 | Fault find and repair Remote Control systems up to component level | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 5 | Level TBA: Pre-2009 was L5 | 7 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
The person credited with this unit standard is able to prepare the work area for fault finding and repairing of remote control systems by selecting the correct equipment, tools and manufacturers manuals to ensure testing to take place. Learners will also be able to follow methods and techniques to diagnose faults and withdraw the faulty remote control systems from service. Learners will also be able to repair or replace the faulty components and reassemble and calibrate it ready for service.
Learners will also be able to complete all the administrative procedures required to return the remote control systems back to operational conditions and ensure it is certified. The qualifying learner is capable of: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
Learners accessing this Qualification will have demonstrated competence in:
|
UNIT STANDARD RANGE |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan and prepare for fault finding and repairing of remote control systems. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Work area is prepared for fault finding and repairing remote control systems. |
ASSESSMENT CRITERION 2 |
Test equipment and tools are selected in accordance with the task requirement and specific equipment being used. |
ASSESSMENT CRITERION 3 |
Authorised manufacturer's manuals are selected applicable to the specific Remote Control systems. |
ASSESSMENT CRITERION 4 |
Safety equipment is obtained and used in accordance with worksite safety procedures. |
ASSESSMENT CRITERION 5 |
Documentation is obtained in accordance with organisational policy and procedure. |
ASSESSMENT CRITERION 6 |
Arrangements for the withdrawal of operation of the Remote Control systems are made according to organisational policy and procedure. |
SPECIFIC OUTCOME 2 |
Diagnose faults on remote control systems. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Faulty remote control systems are withdrawn from service according to organisational policy and procedure. |
ASSESSMENT CRITERION 2 |
Methods and techniques to be followed in diagnosing faults on remote control systems are explained in terms of specific equipment. |
ASSESSMENT CRITERION 3 |
Test equipment is connected and set-up according to manufacturer's instructions and specifications. |
ASSESSMENT CRITERION 4 |
Test is performed and values are compared against values on application data sheets. |
SPECIFIC OUTCOME 3 |
Repair the fault on the remote control systems. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Faulty components in the remote control systems are identified and repaired or replaced according to manufacturer's specifications in order to rectify the fault. |
ASSESSMENT CRITERION 2 |
Remote control systems is re-assembled and calibrated according to manufacturer's instructions and specifications. |
ASSESSMENT CRITERION 3 |
Functional tests are performed on the remote control systems according to manufacturer's instructions and specifications. |
ASSESSMENT CRITERION 4 |
The consequences of not repairing the faulty remote control systems according to manufacturer's instructions and specifications are explained with examples of the impact on operations and safety. |
SPECIFIC OUTCOME 4 |
Establish normal operational conditions for the remote control systems after completion. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Equipment is reinstated in accordance with organisational policy and procedure. |
ASSESSMENT CRITERION 2 |
Work area is restored and tidied in accordance with organisational policy and procedure. |
ASSESSMENT CRITERION 3 |
Documentation is finalised in accordance with organisational policy and procedure. |
ASSESSMENT CRITERION 4 |
Test equipment and tools are stored according to organisational policy and procedure. |
SPECIFIC OUTCOME 5 |
Check integrity of remote control systems and installations. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Test procedures to be followed are explained regarding specific type of equipment under test. |
ASSESSMENT CRITERION 2 |
Remote control systems are tested according to manufacturer's specifications. |
ASSESSMENT CRITERION RANGE |
Remote control CS90 may be tested under either simulated or operational conditions. |
ASSESSMENT CRITERION 3 |
Procedures to be followed if remote control systems fail tests are explained in order to determine action to be taken. |
ASSESSMENT CRITERION 4 |
Remote control systems equipment is calibrated according to manufacturer's specifications. |
ASSESSMENT CRITERION 5 |
Remote control systems are certified in accordance with organisational policy and procedures. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems pertaining to the fault finding and repair of remote control systems up to component level. |
UNIT STANDARD CCFO WORKING |
Work effectively with others to ensure faulty remote control systems are withdrawn and returned to service as and when required. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself and one's activities to ensure full and proper preparations are done before attempting to fault find, test and repair remote control systems. |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information which will assist in the decision making on the diagnosing, testing, finding and repairing of faults to remote control systems. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively when making arrangements for the withdrawal of remote control systems from operation and in the processing of documentation. |
UNIT STANDARD CCFO SCIENCE |
Use science and technology to assist in the fault finding, testing and repairing of remote control systems. |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems where the incorrect or damaged fault finding and repair of a remote control systems can have a negative impact on the safety of both people and operations. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
> Fault finding. > Repairing. > Functional testing. > Re-instating. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 63529 | National Certificate: Railway Signalling Technology | Level 5 | Level TBA: Pre-2009 was L5 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | TETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |