All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Identify, handle and assemble Medium or High Voltage line hardware and related materials |
SAQA US ID | UNIT STANDARD TITLE | |||
258922 | Identify, handle and assemble Medium or High Voltage line hardware and related materials | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 4 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard replaces: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
113872 | Identify, handle and assemble medium / high voltage line hardware and related materials | Level 2 | NQF Level 02 | 4 |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons working in the Electrical Engineering and Distribution environment.
A person credited with this unit standard will be able to: This unit standard will contribute to the full development of the learner within the Electrical Engineering and Distribution environment.The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the Electrical Infrastructure Construction environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and/or equivalent:
|
UNIT STANDARD RANGE |
This unit standard applies to persons working with, handling and assembling Medium or High Voltage line hardware and related equipment independently:
|
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Identify and handle the appropriate Medium or High Voltage line hardware. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Instructions are interpreted and carried out as per job requirement. |
ASSESSMENT CRITERION 2 |
Hardware is identified as per instruction. |
ASSESSMENT CRITERION 3 |
Personal protective equipment is worn when handling hardware as per safe work procedures. |
ASSESSMENT CRITERION 4 |
Hardware selected and handled as per work instruction/manufacturer`s requirements, applying basic rigging principles if required. |
SPECIFIC OUTCOME 2 |
Identify and handle the appropriate Medium Voltage equipment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Instructions are interpreted and carried out as per job requirement. |
ASSESSMENT CRITERION 2 |
Equipment is identified as per instruction. |
ASSESSMENT CRITERION 3 |
Personal protective equipment is worn when handling equipment as per safe work procedures. |
ASSESSMENT CRITERION 4 |
Equipment selected and handled as per work instruction/manufacturer`s requirements, applying basic rigging principles if required. |
SPECIFIC OUTCOME 3 |
Assemble Medium or High Voltage line hardware. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The work site/area is prepared according to worksite procedures. |
ASSESSMENT CRITERION 2 |
Personal protective equipment is worn when assembling hardware as per safe work procedures. |
ASSESSMENT CRITERION 3 |
The line hardware is assembled in a logical sequence as per manufacturer`s specifications and job requirements. |
ASSESSMENT CRITERION 4 |
Work site is left clean and excess material removed as per environmental legislation. |
SPECIFIC OUTCOME 4 |
Identify and handle related materials used during Medium or High Voltage line hardware assembly. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Related materials are identified as per job requirements. |
ASSESSMENT CRITERION 2 |
Environmental requirements of applicable related materials is adhered to. |
ASSESSMENT CRITERION 3 |
Personal protective equipment is worn when handling related materials as per safe work procedures. |
ASSESSMENT CRITERION 4 |
Related materials are selected and handled as per manufacturer`s specifications and job requirements. |
ASSESSMENT CRITERION 5 |
Waste materials are disposed of as per environmental requirements. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
Anyone assessing a learner against this unit standard must be registered as an assessor with the relevant ETQA. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO COLLECTING |
Collect, evaluate, organise and critically evaluate information related to medium/high voltage line hardware and related materials so that these are accurately interpreted into application performance standards. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
This unit standard replaces unit standard 113872, which is "Identify, handle and assemble medium/high voltage line hardware and related materials", Level 2, 4 Credits. Originally re-registered on 11 February 2004 under SAQA decision number 2552/04.
Supplementary Information: Specified requirements: Specified requirements include legal and legislative specific requirements and are contained in one or more of the following documents: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 73313 | National Certificate: Electrical Engineering | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | 4 TOPS ACADEMY |
2. | Better Best Agri Development |
3. | ESKOM GENERATION - PALMIET PUMP STORAGE GRABOUW |
4. | Goitsebasadi Construction Project |
5. | In Touch Community Development & Project Managers |
6. | KP ACADEMY (PTY) LTD |
7. | MSC ARTISAN ACADEMY |
8. | PCD College cc |
9. | POWER SYSTEMS TRAINING, CAPE TOWN |
10. | Protech Training (Pty) Ltd |
11. | Umfolozi FET College |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |