All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Produce an ear mould and shell |
SAQA US ID | UNIT STANDARD TITLE | |||
264998 | Produce an ear mould and shell | |||
ORIGINATOR | ||||
SGB Manufacturing and Assembly Processes | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 14 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard will be useful to people who are involved in the manufacturing or assembly process and need to use the casting process.
The qualifying learner is capable of: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
UNIT STANDARD RANGE |
Specific range statements are provided in the body of the unit standard where they apply to particular specific outcomes or assessment criteria. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Take an impression of an ear. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Impression taking tools, materials and equipment are available for use prior to commencement. |
ASSESSMENT CRITERION RANGE |
Tools, materials and equipment may include but are not limited to Otoscope, filling instrument, Oto-stops, syringe and silicon impression material. |
ASSESSMENT CRITERION 2 |
Impression taking technique is applied in accordance with health and safety requirements. |
ASSESSMENT CRITERION 3 |
Curing process is explained with examples in terms of time and type of material. |
ASSESSMENT CRITERION 4 |
Impression is removed from the ear following procedures. |
ASSESSMENT CRITERION RANGE |
Procedures may include but are not limited to releasing vacuum, no discomfort to client and not damaging the impression. |
ASSESSMENT CRITERION 5 |
Impression is inspected in order to determine conformance to quality standards. |
ASSESSMENT CRITERION 6 |
The consequences of impression non-conformance are explained in terms of its impact on client, quality, production and waste. |
SPECIFIC OUTCOME 2 |
Create a negative of the impression. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Impression is prepared for making the negative according to procedure. |
ASSESSMENT CRITERION 2 |
The negative is moulded using the appropriate material in accordance with standard operating procedures. |
ASSESSMENT CRITERION 3 |
The negative is allowed to cure and removed from the impression. |
SPECIFIC OUTCOME 3 |
Create the mould cavity. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Tools, material and equipment are ensured to be ready for use prior to commencement. |
ASSESSMENT CRITERION RANGE |
Tools, material and equipment may include but are not limited to cutting knife, cutting board, marking pen, Dremel Tool (hand grinding machine), burrs, cutters, and trimmers. |
ASSESSMENT CRITERION 2 |
The ear impression is cut, marked and shaped according to client order specifications. |
SPECIFIC OUTCOME 4 |
Cast moulds and shells. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Casting tools, materials and equipment are available for use prior to commencement. |
ASSESSMENT CRITERION RANGE |
Casting tools, materials and equipment may include but are not limited to the impression, gel form set, perforated spool, wax pot, wax, heated wax knife, gel machine, compressor, light curing unit and refrigerator. |
ASSESSMENT CRITERION 2 |
The impression is prepared for casting in accordance with required specifications. |
ASSESSMENT CRITERION 3 |
The mould and/or shell is formed using the impression. |
ASSESSMENT CRITERION 4 |
The curing process is followed according to standard operating procedures. |
SPECIFIC OUTCOME 5 |
Inspect castings. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Castings are visually inspected against the impression and standard operating procedures. |
ASSESSMENT CRITERION 2 |
Non-conforming and defective castings are rejected, processed and reported in accordance with standard operating procedures. |
ASSESSMENT CRITERION 3 |
Release castings that meet requirements according to standard operating procedures. |
SPECIFIC OUTCOME 6 |
Finish off moulds and shells. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Moulds and shells are ground to meet order requirements. |
ASSESSMENT CRITERION 2 |
Moulds and shells are prepared for next process in accordance with standard operating procedures. |
ASSESSMENT CRITERION 3 |
Work area is returned to operating standards in order to conform to health safety and environmental requirements. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems in order to identify sub-standard and hazardous conditions, assess and take appropriate action. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself and one's activities in order to ensure that a work and time schedule is followed and adjusted when necessary to allow for unexpected interruptions. |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information in order to reconcile the information from visual and physical examinations and constantly evaluate the changing situation. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively with the relevant personnel with regard to the reporting of hazards and sub-standard conditions will indicate his/her proficiency in effective communication. |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems where the identification and referral of anomalous behaviour to a specialist confirms understanding that a specific observation, interference, action or decision can have a devastating effect. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
N/A |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 67569 | National Certificate: Electronics Manufacturing and Assembly | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2015-06-30 | MERSETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |