All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Complete post-production and finishing operations |
SAQA US ID | UNIT STANDARD TITLE | |||
265000 | Complete post-production and finishing operations | |||
ORIGINATOR | ||||
SGB Manufacturing and Assembly Processes | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 6 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard replaces: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
9878 | Complete post-production and finishing operations | Level 2 | NQF Level 02 | 12 |
PURPOSE OF THE UNIT STANDARD |
The person credited with this unit standard is able to organise and carrying out of post-production and finishing operations in order to ensure all the manufactured and/or assembled products meet both the customers and/or job requirements.
The qualifying learner is capable of: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
UNIT STANDARD RANGE |
N/A |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Prepare for post-production and finishing activities. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Packing and finishing requirements for product or components are checked in accordance with specific product requirements. |
ASSESSMENT CRITERION 2 |
Required materials and tools are at work station ready for use. |
ASSESSMENT CRITERION 3 |
Working area is prepared according to standard operating procedures. |
SPECIFIC OUTCOME 2 |
Apply finishing procedures to product. |
OUTCOME RANGE |
Finishing products may include marking, labelling, stamping; packing, wrapping, stacking; simple product testing such as functionality testing, bundling, strapping, coiling, straightening, binding and reeling. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Finishing procedures are explained in terms of product and customer requirement. |
ASSESSMENT CRITERION 2 |
Operations and procedures to the finished or semi-finished product are carried out according to product and customer requirements. |
ASSESSMENT CRITERION 3 |
Products and equipment are handled and used safely and correctly. |
ASSESSMENT CRITERION 4 |
Wastage or damage to product is kept to a minimum. |
ASSESSMENT CRITERION 5 |
Finished products are sent to the next stage or storage. |
SPECIFIC OUTCOME 3 |
Carry out post-production/assembly operations. |
OUTCOME RANGE |
Post-production operations include clamping, placing into fixtures or jigs, cleaning off residues, polishing, wiping, washing, dusting, lifting, removing product; conditioning, annealing or post-cure, spraying and punching. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Product is dispatched to customer or down line process. |
ASSESSMENT CRITERION 2 |
All occurances are reported according to standard operating procedures. |
ASSESSMENT CRITERION 3 |
Tools and equipment are checked that they are mechanically sound and problems are reported according to workplace specific requirements. |
ASSESSMENT CRITERION 4 |
Materials, tools and equipment are stored according to standard operating procedures. |
ASSESSMENT CRITERION 5 |
Implications of the incorrect storing of materials, tools and equipment are described of its impact on health, safety and production. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Names and functions of:
Attributes, descriptions, characteristics and properties: Purpose of: Processes, events, causes and effects, implications: Procedures and techniques: Regulations, legislation, agreements, policies, standards: Theory: rules, principles laws: Relationships, systems: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems in order to recognise and respond to problems. |
UNIT STANDARD CCFO WORKING |
Work effectively with others in order to contribute to the workgroup`s effort to complete post-production and finishing operations. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself and one's activities in order to ensure that a work and time schedule is followed and adjusted when necessary to allow for unexpected interruptions. |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information from the process and the products in order to classify the information and identify deviations from the norm. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively: Record outputs, incidents, measurements, report incidents and conditions, respond to questions or requests for more details. |
UNIT STANDARD CCFO SCIENCE |
Use science and technology in the process of using tools, instruments and components to complete production operations and packaging. |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems in order to adapt general procedures for specific purposes and situations required for a particular product or customer. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
This unit standard replaces unit standard 9878, "Complete post-production and finishing operations", Level 2, 12 credits. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 67569 | National Certificate: Electronics Manufacturing and Assembly | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2015-06-30 | MERSETA |
Core | 79686 | National Certificate: Metal and Engineering Manufacturing Processes | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
Elective | 58781 | National Certificate: Production Technology | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |