All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Support an underground work place by means of wire mesh and lacing |
SAQA US ID | UNIT STANDARD TITLE | |||
9600 | Support an underground work place by means of wire mesh and lacing | |||
ORIGINATOR | ||||
SGB Mining and Minerals | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Fabrication and Extraction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 4 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2004-12-02 | 2007-12-02 | SAQA 1657/04 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2008-12-02 | 2011-12-02 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard will be useful for people who have the responsibility of supporting an underground working place by means of wire mesh and lacing.
People credited with this unit standard are able to: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The credit calculation is based on the assumption that learners are already competent in terms of the following outcomes or areas of learning when starting to learn towards this unit standard:
|
UNIT STANDARD RANGE |
Specific range statements are provided in the body of the unit standard where they apply to particular specific outcomes or assessment criteria. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Explain specified requirements pertaining to wire mesh and lacing. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The support pattern for the installation of wire mesh and lacing and the consequences to safety if specified requirements are not adhered to, are explained. |
ASSESSMENT CRITERION 2 |
2. The significant risks and consequences associated with the workplace hazards pertaining to the installation of wire mesh and lacing are explained. |
ASSESSMENT CRITERION RANGE |
Range of workplace hazards must include:
|
ASSESSMENT CRITERION 3 |
3. The significant risks and consequences associated with the work-related hazards pertaining to the installation of wire mesh and lacing are explained. |
ASSESSMENT CRITERION RANGE |
Range of work related hazards must include:
|
SPECIFIC OUTCOME 2 |
Prepare to install wire mesh and lacing. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The required personal protective equipment is available, fit for purpose, operational and used in accordance with specified requirements. |
ASSESSMENT CRITERION 2 |
2. The required tools, material and equipment are available in the workplace fit for purpose and operational in accordance with specified requirements. |
ASSESSMENT CRITERION 3 |
3. Tools, material and equipment are transported, stacked and secured in accordance with specified requirements. |
ASSESSMENT CRITERION 4 |
4. The area where the wire mesh and lacing are to be installed is examined for workplace hazards in accordance with specified requirements. Workplace hazards are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION RANGE |
Range must include:
|
ASSESSMENT CRITERION 5 |
5. The work place is secured in accordance with specified requirements. |
ASSESSMENT CRITERION RANGE |
Range must include:
|
ASSESSMENT CRITERION 6 |
6. Scaffolding to install wire mesh and lacing at excessive heights is erected in accordance with specified requirements. |
ASSESSMENT CRITERION 7 |
7. The consequences to safety, health and production if specified requirements are not adhered to whilst preparing to install wire mesh and lacing, are explained. |
ASSESSMENT CRITERION RANGE |
Range of non-adherence to specified requirements must include:
|
SPECIFIC OUTCOME 3 |
Install wire mesh and lacing. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The wire mesh and lacing is installed in accordance with specified requirements. |
ASSESSMENT CRITERION RANGE |
Range must include:
|
ASSESSMENT CRITERION 2 |
2. Work-related hazards are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION RANGE |
Range of work related hazards must include:
|
ASSESSMENT CRITERION 3 |
3. Tools and equipment are prepared and stored for subsequent use and those found defective, are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 4 |
4. Interpersonal interaction is positive, consistent with specified requirements, promotes effective teamwork and avoids dysfunctional conflict. |
ASSESSMENT CRITERION 5 |
5. Reports are completed and submitted in accordance with specified requirements. |
ASSESSMENT CRITERION 6 |
6. Consequences to health, safety and production if specified requirements are not adhered to whilst installing and wire mesh and lacing, are explained. |
ASSESSMENT CRITERION RANGE |
Range of non-adherence to specified requirements must include:
|
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Essential embedded knowledge will be assessed through assessment of the specific outcomes in terms of the stipulated assessment criteria. Candidates are unlikely to achieve all the specific outcomes, to the standards described in the assessment criteria, without knowledge of the listed embedded knowledge. This means that for the most part, the possession or lack of the knowledge can be directly inferred from the quality of the candidate`s performance. Where direct assessment of knowledge is required, assessment criteria have been included in the body of the unit standard.
The embedded knowledge required for this unit standard is found in Specific Outcome "Explain specified requirements pertaining to wire mesh and lacing." |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems and make decisions using critical and creative thinking.
|
UNIT STANDARD CCFO WORKING |
Work effectively with others as members of a team, group, organisation or community.
|
UNIT STANDARD CCFO ORGANISING |
Organise and manage themselves and their activities responsibly and effectively.
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information.
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively, using visual, mathematical and / or language skills in the modes of oral and / or written presentations.
|
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically showing responsibility towards the environment and health of others.
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems by recognising that problem-solving contexts do not exist in isolation.
|
UNIT STANDARD ASSESSOR CRITERIA |
Assessors should keep the following principles in mind when designing and conducting assessments against this unit standard:
|
UNIT STANDARD NOTES |
Terminology
Specified Requirements Specified requirements include legal and site-specific requirements and are contained in one or more of the following documents: Legal Site Specific |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 49013 | National Certificate: Mining Operations: Underground Hard Rock | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2007-08-16 | Was MQA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | ALLOYS HEAD OFFICE |
2. | ASSMANG (PTY) LTD |
3. | ASSMANG BEESHOEK MINE |
4. | BARBERTON MINES (PTY) LTD |
5. | CONCOR PROJECTS PTY LTD |
6. | DEI GRATIA TRAINING AND DEVELOPMENT SOLUTION |
7. | EASTERN CHROME MINES |
8. | EASTERN CHROME MINES SAMANCOR |
9. | FINSCH DIAMOND MINE(PTY) LTD |
10. | FOSKOR (PTY) LTD |
11. | GLENCORE OPERATIONS SOUTH AFRICA PTY LTD |
12. | HARMONY GOLD MINING CO LTD |
13. | HOTAZEL MANGANESE MINES (PTY) LTD |
14. | IMPALA PLATINUM SERVICES LTD |
15. | JUAB GENERAL DEALER |
16. | MANCAS CONSULTINGS CC |
17. | MATHOME TRAINING AND DEVELOPMENT (PTY) LTD |
18. | METSKILL PTY LTD |
19. | MODIKWA MINING PERSONNEL SERVICES PTY L TD |
20. | MURRAY & ROBERTS CEMENTATION (PTY)LTD |
21. | NORTHAM PLATINUM LTD |
22. | PALABORA COPPER (PTY) LTD |
23. | PRISMA TRAINING SOLUTIONS (PTY) LTD |
24. | PROGRESSIVE TRAINING DEVELOPMENT AND PROJECTS (PTY) LTD |
25. | SASOL GLOBAL LEARNING |
26. | SENZEKO EXECUTIVE RISK CC |
27. | SIBANYE GOLD ACADEMY PROPRIETARY LIMITED |
28. | THUNGELA OPERATIONS (PTY) LTD |
29. | XTRACT TRAINING SERVICES (SA)(PTY)LTD |
30. | ZULEK TRAINING SPECIALISTS |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |