All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Operate a production process |
SAQA US ID | UNIT STANDARD TITLE | |||
244338 | Operate a production process | |||
ORIGINATOR | ||||
SGB Manufacturing and Assembly Processes | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 15 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2026-06-30 | 2029-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for people who work, or intend to work in a manufacturing process or similar environment. It will contribute towards the achievement of a National Certificate in a manufacturing process or similar environment at NQF Level 2. Equipment operated in this unit standard is against a set of specific instructions.
People credited with this unit standard are able to: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The credits allocated to this unit standard assume that I have a General Education and Training Certificate (GETC) in Manufacturing, Engineering and Related Activities (NQF Level 1) or an equivalent qualification that included learning in Mathematics and Communication in English, Safety, Health, Environment and Quality, and relevant technology. They also assume that I am working towards my qualification as part of a learning programme, which integrates all the required unit standards.
My learning time will increase if I do not have: My learning time will be decreased if I have experience in this field because: |
UNIT STANDARD RANGE |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Prepare for start up. |
OUTCOME RANGE |
Prepare for start up includes preparation of material, equipment and/or process in line with product and scheduling requirements. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The status of the equipment is established and related documentation completed, according to company requirements. |
ASSESSMENT CRITERION 2 |
Equipment is checked to ensure correct settings and good working order, and process parameters are verified to be suitable for the production run. |
ASSESSMENT CRITERION 3 |
Any faults within the operator's scope are repaired. System faults, and faults which are not the responsibility of the operator, are reported to the appropriate persons, as shown on the checklists or faultfinding guidelines. |
ASSESSMENT CRITERION 4 |
Materials and consumables are checked to be available, of the correct type, quantity and quality, in accordance with documentation. Discrepancies are dealt with in accordance with company specific requirements. |
ASSESSMENT CRITERION 5 |
The preparation process is completed as per relevant company documentation. The documentation accurately reflects the status of each preparation stage, is signed off, and where and when required, the status of the preparation process is communicated to designated personnel. |
ASSESSMENT CRITERION 6 |
The importance of thorough preparation and the consequences of poor preparation are described in terms of the effect on safety, quality of product, and productivity. |
SPECIFIC OUTCOME 2 |
Start equipment and/or process. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Personal Protective Equipment (PPE) is worn so that it protects the operator and prevents the product from being spoiled. All protective equipment is used as described in the maker's instructions, company policy and safety legislation. |
ASSESSMENT CRITERION 2 |
Production equipment and/or process is started as per equipment, product and/or process specifications. |
ASSESSMENT CRITERION 3 |
Safety parameters are applied and complied with, as per standard operating procedures. |
ASSESSMENT CRITERION RANGE |
Procedures include but are not limited to work procedures, standard operating procedures, works instructions, job cards, quality procedures, safe working procedures and environmental procedures. |
ASSESSMENT CRITERION 4 |
Operating conditions of equipment are achieved, as per equipment, product and process specifications. |
SPECIFIC OUTCOME 3 |
Operate manufacturing equipment and/or process. |
OUTCOME RANGE |
Operate manufacturing equipment and/or process includes:
|
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Equipment is operated safely, and production wastage is kept to a minimum. Every opportunity to rework non-conforming product is taken. Where there is waste, it is disposed of in line with standard operating procedures and environmental policies. |
ASSESSMENT CRITERION 2 |
Equipment is adjusted to achieve optimal performance, in line with manufacturer's recommendations and standard operating procedures. |
ASSESSMENT CRITERION 3 |
Ingredients are added in the correct sequence and at the appropriate time for the product specifications and the production run. |
ASSESSMENT CRITERION 4 |
In-process checks are performed as and when required, and corrective action taken to ensure that product conforms to specifications. |
ASSESSMENT CRITERION 5 |
Product conforms to specification. |
ASSESSMENT CRITERION 6 |
The consequences of out of specification product are explained in terms of cost to productivity and consumer satisfaction. |
ASSESSMENT CRITERION RANGE |
Productivity includes impact of time and product wastage on product cost and profitability. |
ASSESSMENT CRITERION 7 |
Any differences from normal equipment performance are noted and running adjustments made. Deviations or breakdowns, should they occur, are recorded and communicated to designated personnel, and the relevant corrective measures are ensured to have been taken before proceeding. |
SPECIFIC OUTCOME 4 |
Shut down manufacturing equipment and/or process. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Equipment is shut down safely and in the correct sequence, in accordance with the manufacturer's requirements. |
ASSESSMENT CRITERION 2 |
Appropriate documentation is completed in time and accurately, and meets company specific requirements. |
ASSESSMENT CRITERION 3 |
Storage receptacles used are fit for purpose, free of contamination, and correctly labelled, in accordance with standard operating procedures. |
ASSESSMENT CRITERION 4 |
Product is checked for correct quantity, quality and physical appearance, and results are documented accurately. Deviations from specifications, should they occur, are recorded and either rectified or reported to the designated person, and corrective measures are ensured to have been taken. |
ASSESSMENT CRITERION 5 |
Product status is communicated to designate personnel in accordance with company specific requirements. |
SPECIFIC OUTCOME 5 |
Conduct post-operating processes. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Equipment is checked for defects, and corrective action is taken where in the scope of the operator's work. |
ASSESSMENT CRITERION 2 |
Problems beyond the operator's scope of work are reported to designated personnel for corrective action. |
ASSESSMENT CRITERION 3 |
The cleaning of equipment ensures that it is free from contamination and ready for the next run, in line with standard operating procedures or site specific instructions. |
ASSESSMENT CRITERION 4 |
Consequences of incorrect cleaning are explained with reference to contamination, product quality and productivity. |
ASSESSMENT CRITERION 5 |
Any problems or difficulties around shut down and cleaning of equipment are noted and solutions are developed to improve performance. |
ASSESSMENT CRITERION 6 |
Hand over, quality and productivity documentation is completed accurately, as per company and legislation or regulation when this is applicable. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Things I know and can explain:
Names & functions of: Attributes, descriptions, characteristics & properties: Sensory cues: Purpose of: Processes, events, causes and effects, implications: Procedures and techniques: Regulations, legislation, agreements, policies, standards: Theory: rules, principles, laws: Relationships, systems: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems:
|
UNIT STANDARD CCFO WORKING |
Work effectively with others as a member of a team group, organization or community:
|
UNIT STANDARD CCFO ORGANISING |
Organise and manage my activities and myself:
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information:
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively:
|
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically:
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems:
|
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Supplementary Information:
Determination of credits: Classroom learning: 40 hours. On-the-job learning: 80 hours. Self directed learning: 10 hours. Coaching required: 20 hours. Total: 150 hours. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 58718 | National Certificate: Metals Processing | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
Elective | 65809 | National Certificate: Automotive Manufacturing and Assembly | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
Elective | 58781 | National Certificate: Production Technology | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
Elective | 66449 | National Certificate: Foundry Operations | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2013-11-07 | MERSETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |