All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Mount solar water heating system |
SAQA US ID | UNIT STANDARD TITLE | |||
262784 | Mount solar water heating system | |||
ORIGINATOR | ||||
SGB Civil Engineering Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Civil Engineering Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 20 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
Learners accredited with this Unit Standard will understand the relevant theory regarding solar water heating systems and be able to install the system taking due cognisance of roof types and other related matters. Importantly, the installer will work under the supervision of a qualified plumber at all times.
Learners credited with this standard will be able to: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
UNIT STANDARD RANGE |
Systems include but are not limited to direct/indirect, pump/thermo-siphon; flat plate/evacuated tube; split/close couple; retrofit/new installation; pre-heat/feed; freeze protection; scale protection, hail protection; thermal locks, air locks, combinations each with its own dynamics. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Explain the theory regarding solar heating water systems. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The basic installation criteria are explained to or in order to ensure that installation is according to manufacturer's instructions and specification. |
ASSESSMENT CRITERION 2 |
The dangers of solar heating are explained so that special care is taken during installation to limit exposure. |
ASSESSMENT CRITERION 3 |
The aspects pertaining to the various solar water heating configurations are explained to determine impact on installation. |
ASSESSMENT CRITERION 4 |
Problems regarding the solar water heating system are identified and reported to plumber or supervisor. |
SPECIFIC OUTCOME 2 |
Demonstrate and apply knowledge of roof trusses in order to complete installation of solar water heating system. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Specified dimensions are accurately understood from plumber instructions according to regulations. |
ASSESSMENT CRITERION RANGE |
Includes SANS 10400, Part L, SANS 10254, SANS 10252 Part 1. |
ASSESSMENT CRITERION 2 |
Carpentry tools, machines and equipment are identified, checked for functionality and used. |
ASSESSMENT CRITERION 3 |
Preparation of trusses is explained and implemented according to plumber's instructions and drawings. |
ASSESSMENT CRITERION 4 |
Work on roof in preparation for installation of solar heating system is explained and performed according to plumber's instructions. |
ASSESSMENT CRITERION 5 |
National Building Regulations and safety legislation are explained and applied in order to ensure compliance. |
SPECIFIC OUTCOME 3 |
Plan and prepare for installation of solar water heating system. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Appropriate hand and power tools and equipment are identified, selected and used according to manufacturer's specifications. |
ASSESSMENT CRITERION 2 |
Personal protective equipment is selected according to the work functions to be performed and worn in accordance with manufacturer's recommendations. |
SPECIFIC OUTCOME 4 |
Install solar water heating system according to plumber's instruction. |
OUTCOME NOTES |
Pre-site assessment is completed by qualified plumber and the relevant information is conveyed to the hot water system installer per task. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The location, orientation and positioning of solar heating components are completed as per instructions and procedure. |
ASSESSMENT CRITERION 2 |
Solar water heating systems' components are assembled as per procedure. |
ASSESSMENT CRITERION 3 |
Solar heating systems are installed for a variety of roof types. |
ASSESSMENT CRITERION 4 |
Heat transfer fluids are used to fill solar collectors and cylinder heat exchangers according to installation procedure. |
ASSESSMENT CRITERION 5 |
The controls are installed, set and programmed to ensure efficient operation. |
ASSESSMENT CRITERION 6 |
Solar water heating systems are pressure tested according to specifications. |
ASSESSMENT CRITERION 7 |
Site instructions are complied with to ensure that installation is completed safely and to the client's satisfaction. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Names, functions and locations of:
Purpose of processes and procedures of: Attributes, properties, characteristics related to: Cause and effect, implications of: Categories of components, processes, concepts: Procedures and techniques: Regulations, legislation, agreements, policies: Theory - rules, laws, principles: Relationships, systems: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems in which responses display that responsible decisions using critical and creative thinking have been made when:
|
UNIT STANDARD CCFO WORKING |
Work effectively with others as a member of a team, group, organisation, community to:
|
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself and one's activities responsively and effectively when:
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively using visual, mathematical and/or language skills in the modes of oral and/or written presentation to:
|
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically, showing responsibility towards the environment and the health of others by:
|
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
N/A |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 96402 | National Certificate: Hot Water System Installation | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | Africa International Training Facilities T/A AITF (BREDELL) (TP) |
2. | Better Best Agri Development |
3. | CLEAN HEAT ENERGY SAVING SOLUTIONS (PTY) LTD |
4. | MTL Training and Projects |
5. | Schoolboy Training Centre |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |