All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Maintain static seals in machines and / or equipment |
SAQA US ID | UNIT STANDARD TITLE | |||
13219 | Maintain static seals in machines and / or equipment | |||
ORIGINATOR | ||||
SGB Manufacturing and Assembly Processes | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 4 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2026-06-30 | 2029-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
Learners in the field of engineering require the skills, values and knowledge reflected in this unit standard.
The learning outcomes in this unit standard also contribute to the exit level outcomes required for the National Certificate in Engineering Fitting (NQF level 2) and related qualifications. Qualifying learners are able to identify types of static seals, select for specific use, replace, and test static seals used in machines and equipment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
This unit standard has been designed as part of a progression. It is one of a series of unit standards for machine maintenance in the engineering area.
The credits allocated to this unit standard assume that a learner has already learned to use engineering hand tools, power tools and measuring equipment and maintain a safe and productive work area. |
UNIT STANDARD RANGE |
The ranges as indicated under the specific outcomes determine the scope and level of this unit standard.
Work is generally, but not exclusively, carried out in a team environment. All work is performed under supervision and according to worksite and manufacturer specifications and occupational safety, health and environmental legislation. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan and prepare for seal replacement. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Site and equipment are prepared for installation. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. |
ASSESSMENT CRITERION 2 |
2. Static seal is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. |
ASSESSMENT CRITERION 3 |
3. Installation is checked for compliance. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. |
SPECIFIC OUTCOME 2 |
Prepare site and equipment for seal replacement. |
OUTCOME RANGE |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Site and equipment are prepared for installation. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
ASSESSMENT CRITERION 2 |
2. Static seal is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
ASSESSMENT CRITERION 3 |
3. Installation is checked for compliance. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
SPECIFIC OUTCOME 3 |
Maintain static seals. |
OUTCOME NOTES |
Identify problems and take corrective action |
OUTCOME RANGE |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Site and equipment are prepared for installation. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. |
ASSESSMENT CRITERION 2 |
2. Static seal is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. |
ASSESSMENT CRITERION 3 |
3. Installation is checked for compliance. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task. |
SPECIFIC OUTCOME 4 |
Check equipment for compliance with operational requirements. |
OUTCOME RANGE |
Operational requirements include current static seal used, current tightening of static seal, correct, compatibility with different fluids and pressure capacity, suitable seal type for the application. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Site and equipment are prepared for installation. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
ASSESSMENT CRITERION 2 |
2. Static seal is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
ASSESSMENT CRITERION 3 |
3. Installation is checked for compliance. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
SPECIFIC OUTCOME 5 |
Record information on work done. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Site and equipment are prepared for installation. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
ASSESSMENT CRITERION 2 |
2. Static seal is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
ASSESSMENT CRITERION 3 |
3. Installation is checked for compliance. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
SPECIFIC OUTCOME 6 |
Discuss and explain incidents and problems related to replacing static seals. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Site and equipment are prepared for installation. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
ASSESSMENT CRITERION 2 |
2. Static seal is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
ASSESSMENT CRITERION 3 |
3. Installation is checked for compliance. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
SPECIFIC OUTCOME 7 |
Work safely with care for self, fellow workers, machines, equipment, materials and environment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Site and equipment are prepared for installation. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
ASSESSMENT CRITERION 2 |
2. Static seal is maintained. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
ASSESSMENT CRITERION 3 |
3. Installation is checked for compliance. |
ASSESSMENT CRITERION NOTES |
Indicators:
1. Seal types are accurately identified and seal assembly inspected according to manufacturer specifications 2. Appropriate tools and correct replacement method is determined relevant to seal assembly 3. Seal assemblies are correctly removed from machine / equipment and component parts inspected for conformance with manufacturer specifications 4. Appropriate seals and replacement parts required are selected and obtained 5. Seal and seal assemblies are prepared for installation in accordance with manufacturer requirements 6. Equipment is prepared and inspected for installation 7. Seals and seal assemblies are correctly fitted to machines and / or equipment 8. Seal assemblies are tested for conformance with specifications 9. Appropriate lubrication is applied where necessary to manufacturer specifications 10. Work is carried out in a safe manner in accordance with schedules and manufacturer specifications 11. Replacement process cycle time meets workplace requirements 12. A clean and tidy work environment is maintained 13. No delays are caused as a result of poor planning for replacing seals and identifying problems 14. Seal replacement report is accurate and clear 15. Applicable health, safety and environmental procedures are adhered to Understanding confirmed: Respond to 'what if' and 'why' questions covering: Explain the implications of not adhering to sequence of activities and operations as described in the specific outcomes and making decisions inappropriate to the task |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
The assessment will be governed by the policies and guidelines of the MERSETA Education and Training Quality Assuror who has jurisdiction over this field of learning. The assessor will (at the very least) be accredited and have a technical qualification in this learning area.
The learner can be assessed in the language of his/her choice although s/he has to report incidents or conditions to someone else. The learner will be assessed on his/her ability to report in the language commonly used in his/her working environment. The learner will be assessed in the workplace but s/he can submit documents, projects, test results and assignments that were not produced in the workplace. The learner can be assessed against this unit standard to obtain credits or as part of an integrated assessment for a qualification. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Names & functions of:
Attributes, descriptions, characteristics & properties: Sensory cues: Purpose of: Processes, events, causes and effects, implications: Procedures and techniques: Regulations, legislation, agreements, policies, standards: Theory: rules, principles, laws: Relationships, systems: |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems:
|
UNIT STANDARD CCFO WORKING |
Work effectively with others as a member of a team:
|
UNIT STANDARD CCFO ORGANISING |
Organise and manage my activities and myself:
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information:
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively:
|
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically:
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems:
|
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 58269 | National Certificate: Electro-Mechanics | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
Core | 59689 | National Certificate: Mechanical Engineering | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
Core | 23273 | National Certificate: Mechanical Engineering: Fitting | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2008-06-25 | MERSETA |
Core | 23254 | National Certificate: Mechanical Engineering: Fitting and Machining | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2008-06-25 | MERSETA |
Elective | 65809 | National Certificate: Automotive Manufacturing and Assembly | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
Elective | 78523 | National Certificate: Automotive Repair and Maintenance | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |